What are the facility requirements to run Spinbox?

In your lab you need to have power of (1 single-phase; 220/110 Vacc 50/60 Hz). Then you will have to ensure the solvent vapours extraction (when working with organic solvents) either by placing the Spinbox main module in a fume-hood or by connecting a hose to the outlet connector placed at the right side of the Spinbox main module and take the hose outside the lab (the hose is not included within the supply). And that’s all. Spinbox is basically a Plug & Play system.

Get In Touch